Author Details

Rahman, A.

  • Vol 2, No 4 (2018) - articles
    ANALISIS BIAYA TUNNELING PADA TAMBANG GUDANGHANDAK FRONT PENAMBANGAN RAMP DOWN CONNECT VEIN A, VEIN B UTARA, VEIN B SELATAN DAN VEIN C SELATAN DI PT. ANTAM (PERSERO) Tbk. UBPE PONGKOR
    Abstract  Untitled  PDF
  • Vol 3, No 4 (2019) - articles
    PERENCANAAN ALAT GALI MUAT DAN ANGKUT PADA PRODUKSI BATUBARA 20.000.000 TON DI PT. BUMI MERAPI ENERGI
    Abstract  PDF