Author Details
Sudarmono, Djuki
-
Vol 1, No 5 (2017): Special Issue - articles
KAJIAN TEKNIS SISTEM PENYALIRAN PADA PHASE 5 DI PT. BUKIT ASAM (PERSERO), TBK UNIT PELABUHAN TARAHAN, BANDAR LAMPUNG
Abstract
PDF
-
Vol 1, No 5 (2017): Special Issue - articles
ANALISIS KESTABILAN LERENG MENGGUNAKAN METODE SLOPE MASS RATING DAN METODE STEREOGRAFIS PADA PIT BERENAI PT. DWINAD NUSA SEJAHTERA (SUMATERA COPPER AND GOLD) KABUPATEN MUSI RAWAS UTARA PROVINSI SUMATERA SELATAN
Abstract
PDF
-
Vol 2, No 1 (2018) - articles
ANALISIS DAMPAK DEVIASI DEPTH HOLE TERHADAP DEVIASI EXPLOSIVE SERTA DEVIASI COST DI ELEVASI 450 DAN 465 PHASE 7 PADA BULAN DESEMBER 2016 – JANUARI 2017 DI PT. AMMAN MINERAL NUSA TENGGARA
Abstract
PDF