Author Details

Ibrahim, Eddy

  • Vol 1, No 1 (2016) - articles
    ANALISIS TERJADINYA SWABAKAR DAN PENGARUHNYA TERHADAP KUALITAS BATUBARA PADA AREA TIMBUNAN 100/200 PADA STOCKPILE KELOK S DI PT.KUANSING INTI MAKMUR
    Abstract  PDF
  • Vol 1, No 2 (2017) - articles
    PERENCANAAN TEKNIS SISTEM PENYALIRAN TAMBANG TERBUKA DI PT. BARA ANUGRAH SEJAHTERA LOKASI PULAU PANGGUNG MUARA ENIM SUMATERA SELATAN
    Abstract  PDF
  • Vol 1, No 2 (2017) - articles
    EVALUASI PELAKSANAAN SLEWING SHIFTING DI JALUR CE 11/18- CE11/19 PERIODE JANUARI 2015 DI TAMBANG MTBU-B UNIT PERTAMBANGAN PT BUKIT ASAM (PERSERO) TBK TANJUNG ENIM
    Abstract  PDF
  • Vol 1, No 3 (2017) - articles
    Analisis Potensi Self Heating Batubara Pada Live Stock Dan Temporary Stockpile Banko Barat Pt. Bukit Asam
    Abstract  PDF
  • Vol 2, No 2 (2018) - articles
    ANALISIS COAL LOSSES KEGIATAN PENAMBANGAN DI BLOK 4 PT. INTI BARA PERDANA, KECAMATAN TABA PENANJUNG, KABUPATEN BENGKULU TENGAH, PROVINSI BENGKULU
    Abstract  PDF
  • Vol 2, No 3 (2018) - articles
    KAJIAN TEKNIS GEOMETRI JALAN ANGKUT PRODUKSI TERHADAP PENINGKATAN PRODUKSI OVERBURDEN PADA ALAT ANGKUT ARTICULED DUMP TRUCK VOLVO A 40F DI PT LEMATANG COAL LESTARI KABUPATEN MUARA ENIM
    Abstract  PDF
  • Vol 2, No 4 (2018) - articles
    ANALISIS TEKNIS KEBUTUHAN ALAT MEKANIS TERHADAP KEMAMPUAN AKTUAL RECLAIM FEEDER DI MUARA TIGA BESAR UTARA PT. BUKIT ASAM, TBK. TANJUNG ENIM SUMATERA SELATAN
    Abstract  PDF
  • Vol 3, No 4 (2019) - articles
    PERENCANAAN ALAT GALI MUAT DAN ANGKUT PADA PRODUKSI BATUBARA 20.000.000 TON DI PT. BUMI MERAPI ENERGI
    Abstract  PDF