Author Details
Hasjim, Machmud
-
Vol 1, No 1 (2016) - articles
ANALISIS PENGGALIAN KOMBINASI SISTEM BENCHES DAN VERTICAL DIGGING PADA KAPAL KERUK 21 SINGKEP 1 AREA PENAMBANGAN LAUT AIR KANTUNG PT. TIMAH (PERSERO), TBK.
Abstract
PDF
-
Vol 1, No 5 (2017): Special Issue - articles
STRATEGI UNTUK MENGURANGI WAKTU MENUNGGU LOWBOY DI DIVISI MINING OPERATION PT. KALTIM PRIMA COAL, SANGATTA, KALIMANTAN TIMUR
Abstract
PDF
-
Vol 2, No 1 (2018) - articles
ANALISIS DAMPAK DEVIASI DEPTH HOLE TERHADAP DEVIASI EXPLOSIVE SERTA DEVIASI COST DI ELEVASI 450 DAN 465 PHASE 7 PADA BULAN DESEMBER 2016 – JANUARI 2017 DI PT. AMMAN MINERAL NUSA TENGGARA
Abstract
PDF
-
Vol 2, No 2 (2018) - articles
OPTIMALISASI MATCH FACTOR MELALUI PENGURANGAN WAKTU TUNGGU TERHADAP ALAT ANGKUT PADA PERENCANAAN PENGUPASAN TOP SOIL TAHUN 2017 DI PT. KALTIM PRIMA COAL, SANGATTA, KALIMANTAN TIMUR
Abstract
PDF
-
Vol 3, No 2 (2019) - articles
EVALUASI KEGIATAN PENGEBORAN INTERBURDEN GUNA MENGOPTIMALISASI KETERCAPAIAN TARGET PRODUKSI PELEDAKAN DI PIT 3 TIMUR PENAMBANGAN ELEKTRIFIKASI BANKO BARAT PT. BUKIT ASAM, TBK
Abstract
PDF
-
Vol 3, No 2 (2019) - articles
EVALUASI KINERJA BELT CONVEYOR DARI CRUSHER LIMESTONE 1 MENUJU STOCKPILE UNTUK MENCAPAI TARGET PRODUKSI BATU KAPUR PADA BULAN APRIL 2018 DI PT SEMEN BATURAJA (PERSERO) TBK
Abstract
PDF