Author Details

Asyik, Makmur

  • Vol 1, No 1 (2016) - articles
    MODEL TRANSPORTASI PENGANGKUTAN BATUBARA KE LOKASI DUMPING DENGAN METODE SUDUT BARAT LAUT DAN METODE BIAYA TERENDAH PADA PT. BUKIT ASAM (PERSERO), Tbk
    Abstract  PDF
  • Vol 1, No 3 (2017) - articles
    Analisis Potensi Self Heating Batubara Pada Live Stock Dan Temporary Stockpile Banko Barat Pt. Bukit Asam
    Abstract  PDF
  • Vol 1, No 4 (2017) - articles
    Kajain Teknik Kegiatan Kegiatan Pengurangan Durai Slippery Duration Activities On Overbyurden Road West Block PT. Muara Alam Sejahtera Lahat Sumatera Selatan
    Abstract  PDF
  • Vol 2, No 4 (2018) - articles
    ANALISIS EFISIENSI ALIRAN DAN INDEKS ALIRAN UNTUK PENENTUAN INTENSITAS DAN WAKTU PIGGING PADA PT. MEDCO E&P SOKA, SUMATERA SELATAN
    Abstract  PDF