  • EVALUASI PRODUKTIVITAS ALAT GALI MUAT DAN ANGKUT TERHADAP KETIDAKTERCAPAIAN PRODUKSI BATUBARA DI PIT 2A KABUPATEN LAHAT, SUMATERA SELATAN | pratama | Jurnal Pertambangan

    EVALUASI PRODUKTIVITAS ALAT GALI MUAT DAN ANGKUT TERHADAP KETIDAKTERCAPAIAN PRODUKSI BATUBARA DI PIT 2A KABUPATEN LAHAT, SUMATERA SELATAN

    odie pratama, A Rahman, Diana Purbasari

    Abstract


    ABSTRACT

     

    Coal mining activities are carried out using digging equipment excavator 400 LC-7 backhoe PC as much as 2 units and 5 units of dump truck Mitsubishi Fuso and 5 units of dump truck Nissan CWB. The coal production target in 2017 is 1.230.000 tons/year, but in reality the production achieved is only 950.872,35 tons/year, as well as 2018, production target cant be achieved in February and March.The data taken iscycle time of excavating and hauling equipment, the amount of coal filling in the vessel and supporting data of the company. The analysis and calculation of coal production is carried to evaluate and repair efforts. The results of evaluation is productivity of excavating and hauling equipment showed that the productivity of the excavator didn’thave problems, but the productivity of the hauling equipment didn’t  reach the target because of  low job efficiency and loading of coal in Mitsubishi Fuso 220 Ps with match factor <1. The efforts made to increase the productivity of hauling equipment by increasing effective work time by minimizing operator delay, stopped work before rest,and stopped work before working hours so job efficiency increases from 58,4 % to 67,7 % and repairing loading coal on the Mitsubishi Fuso from 6 to 7 times and after that the match factor increase from 0,64 to 0,74. So the productivity of hauling equipment is increased from 1.337.430 tons/year to 1.603.737 tons/year.

     

    Keywords:Coal, Production, Productivity, Match Factor.

     


    Full Text:

    PDF

    References


    Nabar, D. (1998). Pemindahan Tanah Mekanis dan Alat Berat. Palembang: Universitas Sriwijaya.

    Komatsu. (2013). Specification & Application Handbook Edition 31. Japan: Komatsu

    Prodjosumarto, P. (1996). Pemindahan Tanah Mekanis. Bandung: Jurusan Teknik Pertambangan Institut Teknologi Bandung.

    Tenriajeng, A. T. (2003). Pemindahan Tanah Mekanis. Jakarta: Gunadarma.

    Anisari, R.(2012). Kecapaian Target Produksi Pengupasan Batuan Penutup pada PT. Adaro Indonesia Kalimantan Selatan. Jurnal Poros Teknik, Vol. 4 No. 1: 19-23.

    Indonesianto, Y. (2005). Pemindahan Tanah Mekanis. Yogyakarta: Awan Poetih.

    Rochmanhadi. (1992). Alat Alat Berat dan Penggunaannya. Jakarta: Yayasan Penerbit Pekerjaan Umum.

    Hambali, Nurhakim, Riswan, & Dwiatmoko, M.U.(2017). Evaluasi Produksi Alat Gali Muat dan Alat Angkut Sebagai Upaya Pencapaian Target Produksi pada PT. Pama Persada Nusantara Distrik KCMB. Jurnal Himasapta,Vol. 1 No. 2: 9-13.

    Anaperta, Y. M. (2016). Evaluasi Keserasian (Match Factor) AlatMuat dan Alat Angkut Dengan Metode Control Chart (Peta Kendali) pada Aktivitas Penambangan di PitXPitY. Jurnal Teknologi Informasi dan Pendidikan, Vol. 6 No. 1:73-85.

    Nurhakim. (2004). Buku Panduan Kuliah Lapangan–II. Banjarbaru: Jurusan Teknik Pertambangan Universitas Lambung Mangkurat.




    DOI: https://doi.org/10.36706/jp.v3i1.8414

    Refbacks

    • There are currently no refbacks.


    View My Stats 

     

     

    Index by

    Garuda logo

    Google Scholar logo

     

    Sponsored By

    Hasil gambar untuk icon portaltambang