Author Details

Iskandar, Hartini

  • Vol 1, No 1 (2016) - articles
    STUDI PENGARUH KUAT ARUS PADA INDUCED ROLL MAGNETIC SEPARATOR (IRMS) UNTUK MENINGKATKAN PEROLEHAN MINERAL ILMENIT DI AMANG PLANT, BIDANG PENGOLAHAN MINERAL (BPM), UNIT METALURGI, PT. TIMAH (PERSERO), TBK
    Abstract  PDF
  • Vol 1, No 3 (2017) - articles
    Rencana Teknis Penimbunan Mine Out Pit C Pada Tambang Batubara Di Pt. Aman Toebillah Putra Site Lahat Sumatera Selatan
    Abstract  PDF
  • Vol 2, No 1 (2018) - articles
    KAJIAN PERBANDINGAN KINERJA PENGGALIAN BIJIH TIMAH MENGGUNAKAN KAPAL ISAP PRODUKSI TIMAH XV DENGAN KOMBINASI KAPAL ISAP STRIPPING PULAU 7 DAN KAPAL ISAP PRODUKSI TIMAH XV PADA AREA PENAMBANGAN LAUTTEMPILANG PT. TIMAH (PERSERO), TBKKAJIAN PERBANDINGAN KINERJA PENGGALIAN BIJIH TIMAH MENGGUNAKAN KAPAL ISAP PRODUKSI TIMAH XV DENGAN KOMBINASI KAPAL ISAP STRIPPING PULAU 7 DAN KAPAL ISAP PRODUKSI TIMAH XV PADA AREA PENAMBANGAN LAUTTEMPILANG PT. TIMAH (PERSERO), TBK
    Abstract  PDF
  • Vol 2, No 1 (2018) - articles
    EVALUASI SISTEM PENIRISAN TAMBANG DI PIT 2 BLOK KELUANG PT BATURONA ADIMULYA MUSI BANYUASIN SUMATERA SELATAN
    Abstract  PDF
  • Vol 2, No 1 (2018) - articles
    ANALISIS KEHILANGAN (LOSSES) MAGNETITE PADA WASHING PLANT BATUBARA DENGAN KAPASITASFEED 250 TPH PT. KALTIM PRIMA COAL,SANGATTA, KALIMANTAN TIMUR
    Abstract  PDF
  • Vol 2, No 2 (2018) - articles
    ANALISIS TEKNIS SISTEM PENANGANAN DAN PEMANFATAAN AIR ASAM TAMBANG DI WIUP TAMBANG AIR LAYA (TAL) PT. BUKIT ASAM (PERSERO) TBK. TANJUNG ENIM SUMATERA SELATAN
    Abstract  PDF
  • Vol 2, No 4 (2018) - articles
    EVALUASI KINERJA UNIT CRUSHER 07 UNTUK MENINGKATKAN PRODUKSI 07 DI LATI MINE OPERATION PT. BERAU COAL KALIMANTAN TIMUR
    Abstract  PDF
  • Vol 3, No 1 (2019) - articles
    KAJIAN TEKNIS SISTEM PENGELOLAAN AIR PADA KOLAM PENGENDAPAN DI SETTLING POND NORTH 3 UNTUK MEMENUHI STANDAR PERATURAN GUBERNUR KALSEL NOMOR 36 TAHUN 2008
    Abstract  PDF
  • Vol 3, No 3 (2019) - articles
    EVALUASI PRODUKTIVITAS ROLL CRUSHER UNTUK MENCAPAI TARGET PRODUKSI CLAYSTONE UNIT KERJA CRUSHER PT. SEMEN BATURAJA (PERSERO), TBK.
    Abstract  PDF
  • Vol 3, No 3 (2019) - articles
    GAP ANALYSIS PEMENUHAN ELEMEN PADA SISTEM MANAJEMEN KESELAMATAN PERTAMBANGAN BERDASARKAN PERATURAN MENTERI ESDM NOMOR 38 TAHUN 2014 DI PT BUKIT ASAM TBK UNIT PENAMBANGAN TANJUNG ENIM
    Abstract  PDF
  • Vol 3, No 4 (2019) - articles
    PENGELOLAAN AIR KOLAM TAMBANG UNTUK PEMBUKAAN KEMBALI PIT 5 DI PENGARON KALIMANTAN SELATAN
    Abstract  PDF